| Sign In | Join Free | My chinacomputerparts.com |
|
| Categories | Hipot Tester |
|---|---|
| Output Current: | <5mA / 40mA / 200mA / 1A / 5A / 10A / AUTO |
| Model Number: | MY-3110s |
| Accuracy: | <0.2% ± 2 words |
| Price: | 2600USD |
| Packaging Details: | carton |
| Power Supply: | AC 220V |
| Supply Ability: | 100/Month |
| Resolution: | 0.1μΩ |
| Place of Origin: | Hubei China |
| Brand / Model: | MY-3110 |
| Brand Name: | MINGYANG |
| Measuring Range: | 0.5mΩ - 50KΩ |
| MOQ: | 1 |
| Measurement Type: | DC Winding Resistance |
| Payment Terms: | L/C,D/A,D/P,T/T |
| Display: | 7-inch Touchscreen Color LCD |
| Delivery Time: | 1 week |
| Company Info. |
| Wuhan Mingyang Technology Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Transformer Winding Resistance Analyzer
Product Description
MY-3110 DC Winding Resistance Tester is designed to measure DC resistance of inductive devices,
such as transformers and power inductors. It has features of fast
measurement, small size, light weight, large output current, perfect protection functions,
good repeat-ability, good anti-interference ability, high accuracy,
which make it an ideal equipment for measuring DC resistance of
transformer winding and high inductive equipment.
Product Alias
Transformer DC Winding Resistance Tester / 10A Transformer Winding
Resistance Meter / Transformer Coil DC Resistance Analyzer /
Portable DC Resistance Test Instrument
Features
Product Parameters
Output current | <5mA 40mA 200mA 1A 5A 10A AUTO |
Resolution ratio | 0.1μΩ |
Measuring range | 10Ω-50KΩ( <5mA files) 500mΩ-500Ω 40mA files 100mΩ-100Ω (200mA files) 10mΩ-20Ω (1A files) 2mΩ-4Ω (5A files) 0.5mΩ-2Ω (10A files) 0.5mΩ-20KΩ (AUTO) |
Degree of accuracy | <0.2% 2 words |
Working temperature | -10-40℃ |
Working humidity | <80%RH, no condensation |
Application Scenarios

FAQ
Question 1: Abnormal reading / Unstable resistance measurement
value
Customer: When measuring the winding DC resistance of the
transformer, the displayed resistance value keeps fluctuating and
cannot get a stable reading after waiting for a long time. What are
the possible reasons?
Manufacturer: First check whether the test clips are tightly
clamped on the transformer winding terminals, remove surface oxide
layer, paint and dirt on the contact points to ensure good metal
contact. Confirm the transformer has been fully power-off and
discharged completely, residual electromotive force will interfere
with the measurement result. Check if the test cables have internal
breakage or poor contact. Restart the instrument and re-connect the
test leads. If the reading is still unstable, stop the test and
contact technical support. Do not disassemble the instrument by
yourself.
Question 2: Instrument fails to start / Cannot power on
Customer: After pressing the power button, the transformer winding
resistance analyzer does not light up and cannot start the machine.
How to troubleshoot?
Manufacturer: Check whether the battery power is exhausted. If
using the rechargeable version, connect the matching power adapter
to charge the instrument for 30 minutes then try to boot again.
Inspect the power adapter and charging cable for damage or loose
plug connection. Check the power switch and charging port for dust
and corrosion. If charging still cannot activate the device, stop
operation and contact technical support. Do not open the instrument
shell for inspection.
Question 3: Test prompt overcurrent / Overcurrent alarm appears
during measurement
Customer: The instrument triggers overcurrent alarm immediately
after starting the winding resistance test, and the test cannot
continue. What leads to this problem?
Manufacturer: Immediately cut off the test output and stop the
test. Check whether the test wires are short-circuited to each
other. Confirm the transformer winding has no internal
short-circuit fault. Verify the test range and output current
setting match the transformer specification; using excessive test
current for small-capacity transformers will trigger overcurrent
protection. Check whether the test clips accidentally touch the
ground or other metal parts. Recheck wiring and restart the test.
If the alarm repeats, contact technical support. Do not modify the
internal protection circuit.
Question 4: Data cannot be saved / Saved test data missing
Customer: After completing the transformer winding resistance test,
I cannot save the measured data, or the saved data disappears after
restarting the instrument. What should I do?
Manufacturer: Confirm there is enough storage space inside the
instrument. Check whether the data storage function is enabled in
the system menu. If saving to external USB flash drive, verify the
USB disk format is compatible and the USB interface is
well-connected. Avoid cutting off power suddenly during data saving
operation. If the built-in storage fails, back up data timely via
USB export. If the fault still exists, contact technical support.
Do not format the storage disk without guidance.
Question 5: Big deviation between measured value and factory
standard value
Customer: The measured winding resistance value is obviously
different from the transformer factory test report, and the error
exceeds the allowable range. What causes this large deviation?
Manufacturer: Confirm the transformer winding temperature has
stabilized, DC resistance is greatly affected by temperature, and
temperature conversion calculation is required. Check the
connection sequence of test terminals, wrong wiring will produce
wrong measurement results. Make sure all winding taps are placed at
the correct tap position during testing. Eliminate the influence of
residual magnetism of the transformer. Reconnect the test leads and
perform repeated measurement. If the deviation still exists, stop
testing and contact technical support. Do not modify the instrument
calibration parameters without authorization.
Question 6: Shipping Method
Customer: If we place an order, how do you typically ship the
goods? Will there be any issues with transporting bulky items such
as reactors?
Manufacturer: We default to using dedicated logistics lines or
brand-specific express shipping services; small-sized main units
and accessories may also be shipped via standard courier services.
Large items, such as reactors and excitation transformers, are
packed using wooden crates or wooden frames for reinforcement to
prevent bumps and moisture exposure during transit; a packing list
is included with each package to facilitate item-by-item counting
for you. Logistics costs are typically determined by both parties
in accordance with the contract terms; after shipment, we will send
you both the tracking number and the carrier's contact phone number
for easy tracking.If your project site is remote or if delivery to
the site is required with a specified logistics company, please
inform us in advance when placing your order; we can then
coordinate and arrange accordingly.
Question 7: Delivery Lead Time
Customer: Our project is under tight deadlines; how long will it
take for the order to be shipped after we place it? Can we request
expedited shipping?
Manufacturer: Standard specifications – stock available; typically
delivered upon receipt of the order. Orders can be shipped within
[X] working days; for non-standard products requiring customized
voltage levels, capacities, or reactor combination configurations,
the production cycle typically ranges from [X] to [Y] days.The
delivery time will be approximately 7-15 working days; the specific
timeline shall be subject to the sales confirmation provided upon
order placement. If your project has a tight schedule, please
inform us of the latest expected delivery date before placing your
order; we will first verify the production schedule and inventory
status, and where possible, will coordinate expedited production
and prioritize shipment. However, it is recommended to allocate
sufficient transit time for logistics to avoid delaying on-site
testing.
Question 8: After-sales Service and Warranty
Customer: What is the warranty period for this equipment? If any
issues arise during on-site use, how will your after-sales service
respond?
Manufacturer: We provide a two-year free warranty on the entire
unit and lifelong technical support services. During the warranty
period, if issues arise due to defects in the equipment itself, we
will provide free repair or replacement of components; when
problems occur on-site, we commit to responding within 24 hours;
most wiring and parameter configuration issues can be resolved
through remote guidance via video or telephone; for cases where an
on-site visit is necessary, we will arrange for our technicians to
arrive at the location to resolve the issue. After the warranty
period expires, we still offer repair services, with spare parts
supplied at cost price for the long term, and software updates
provided free of charge for life. Upon delivery of the equipment,
we also offer free operational training (video operation guides)to
ensure that your testing personnel can operate the equipment
independently and proficiently; should you have any further
questions, please feel free to contact our dedicated after-sales
hotline directly.
Question 9: Shipping methods for each region (Sea freight)
Customer: Our projects are distributed across several states, and
our procurement volumes are substantial; are the shipping methods
consistent across all states? How is the delivery time calculated?
Manufacturer: The specifications are identical; however, it should
be specifically noted that this equipment set is large in size and
heavy in weight—components such as the reactor and excitation
transformer are all classified as heavy components. Therefore,
regardless of which state or region the shipment is destined for,
we will uniformly utilize sea freight transportation. The packaging
employs export-grade wooden crates with reinforced structures,
along with moisture-proof and rust-proof treatments; the design of
these wooden crates is optimized for long-distance sea transport
and multiple lifting and transshipment operations. Upon arrival at
the destination, simply unpack the goods and conduct an inspection
before putting them into use. Regarding delivery time, the sea
freight transit period depends on the port of destination: near-sea
routes are generally faster, whereas ocean routes may take longer;
the exact number of days will be confirmed based on the shipping
schedule specified in the bill of lading. We have a dedicated
freight forwarding agency to handle booking of shipping space,
customs declaration, insurance, and other related procedures; once
the vessel departs, we will send you documents such as the bill of
lading and the packing list, enabling you to arrange for the
receipt of goods at the port of destination and their inland
transshipment in advance.
scenario
Scene (One)

Scene (Two)

Attachment Directory
| Accessory | Quantity | Description |
|---|---|---|
| Main Test Unit | 1 pc | DC winding resistance tester host |
| 4-wire Test Cables | 1 set | High current test leads for four-wire measurement |
| Alligator Clips | 1 pair | Heavy-duty clips for connecting transformer winding terminals |
| AC220V Power Cord | 1 pc | Mains power supply cable |
| USB Data Cable | 1 pc | For data export and communication |
| Portable Hard Carry Case | 1 pc | Protective suitcase for field transportation |
| User Manual | 1 copy | Operation guide |
| Calibration Certificate | 1 copy | Factory calibration document |
Attachment Image

|