| Sign In | Join Free | My chinacomputerparts.com |
|
| Categories | Metal Stamping Die |
|---|---|
| Brand Name: | IDO |
| Model Number: | dishwasher tub wrapper |
| Certification: | ISO9001 |
| Place of Origin: | China |
| MOQ: | 1 set |
| Price: | $10000-$50000 |
| Payment Terms: | L/C,T/T |
| Supply Ability: | 300 sets/year |
| Delivery Time: | 45days |
| Packaging Details: | Wooden Case, Anti-Rust Oil, Vacuum Packaging |
| Part Name: | Dishwasher Tub Wrapper |
| Part Material: | SUS430 |
| Mould Type: | Stage mold |
| Mould Size: | 2100*1200*600mm |
| Mould Weight: | 10T |
| Punch Tonnage: | 500T |
| Mould Life: | 1,000,000 shots |
| Standard Parts Brand: | MISUMI |
| Company Info. |
| Wuxi IDO Technology Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
Metal Stamping Die SUS430 Stage Die For Dishwasher Tub Wrapper With Punching And Shearing Mould
Description:
This advanced stage die combines high-speed operation with precise forming capabilities. Ideal for dishwasher tub wrapper production, it guarantees consistent quality across high-volume manufacturing runs.
Quick Detail:
Specifications:
Mould/Tool Type | Stage tool/mould/die |
Production Application | White Household Appliances (washing machine, refrigerator, dryer,
dishwasher…), Automobile (heat shield, radiator...) |
Metal Sheet Material | Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061,
6063,7075...), Copper |
Mould Material | V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25 |
Mould Base | SD, LKM Standard, HASCO Standard, Self-made, etc. |
Tolerance | ±0.003mm |
Hardness | Upon request |
Surface Treatment | TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep
Cooling or according to your parts |
Precision Machining | CNC/ surface grinding machine/ wire cutting/ EDM |
Measuring Instruments | CMM/ Profile projector/ electronic height gauge/ spectrum analyzer
/ caliper/ microscope/ micrometer, etc. |
Drawing Format | DWG, STP, STEP, X_T, IGES, PDF |
Design Software | Auto CAD, UG, Solidworks |
Trade terms | FOB (Shanghai) |
Mould Lead time | Generally 6~8 weeks (as per actual situation) |


|