| Sign In | Join Free | My chinacomputerparts.com |
|
| Categories | Polyester Nonwoven Geotextile |
|---|---|
| Brand Name: | SZ |
| Model Number: | Polyester Nonwoven Geotextile |
| Certification: | ISO/CE |
| Place of Origin: | China |
| MOQ: | 20GP |
| Price: | $0.3-$2.0/SQM |
| Payment Terms: | L/C,D/P,T/T,Western Union,MoneyGram |
| Supply Ability: | 8Ton Per Day |
| Delivery Time: | Withine 15 days |
| Packaging Details: | Roll By Woven Bags |
| Product Name: | Polyester Nonwoven Geotextile |
| Process: | Long-fiber Nonwoven |
| Feature: | Anti Static |
| Length: | 50-100 m |
| Type: | filament Nonwoven |
| Application: | Road Reinforce |
| CBR Burst Strength: | 200-4000 N |
| Elongation: | 25-100% |
| Width: | 1-6 m |
| Weight: | 150-800 g/m2 |
| Company Info. |
| Shenzhou Earth Working Material Co. Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Polyester short fiber nonwoven geotextile generally has a width of 4-6 meters and a length of 50-100 meters. Polyester short fiber nonwoven geotextile has a certain degree of tear resistance and deformation adaptability due to its soft fibers, as well as good flat drainage ability, which can play a good role in filtering, isolation,reinforcement, protection, and other functions. Polyester short fiber non-woven geotextile is suitable for soil filtration, soil separation, soil reinforcement and other engineering projects.






1.Our company has a professional logistics team and reliable logistics companies with whom we have long-term cooperation. We can ensure that your goods are delivered on time.
| Maintenance Phase | Inspection Frequency | Key Maintenance Content |
| Construction period (from laying to covering) | Daily + comprehensive inspection before covering | Inspect for damage and splicing defects, and repair them promptly; avoid prolonged exposure to direct sunlight. |
| Initial operation period (within 1 year) | Once every 3 months | Check for loss or collapse of the overburden layer, and refill it promptly; investigate early damage. |
| Mid-operation period (1-5 years) | Once every 6 months | Monitor for signs of geotextile aging (brittleness, discoloration), and clean any blockages in the pores. |
| Late-stage operation (5+ years) | Once every 3 months | Focus on identifying and addressing areas of increased localized damage and detachment at joints, and strengthen protective measures. |
| Special environments (corrosive/open air) | Once every 1-2 months | Increase the frequency of inspections for corrosion and UV damage, and shorten maintenance cycles. |
2. Key Maintenance Points for Different Scenarios
Highway/Railway Subgrade: Monitor pavement cracks and subgrade settlement, and promptly reinforce with grout; backfill with soil to cover collapsed slopes, and perform heat fusion repairs on damaged areas.
Water Conservancy Projects: Regularly remove silt and floating debris to prevent pore blockage; conduct underwater inspections to repair tears or entanglements.
Landfill Sites: Ensure leachate collection pipes are unobstructed to prevent direct contact of chemical waste with geotextile; replace the entire product in the damaged area.
Landscape Greening: Backfill lost planting soil, clear drainage hole blockages, and prevent plant roots from puncturing the geotextile.
Chemical Corrosion Scenarios: Regularly sample and test corrosion resistance; immediately replace modified products if brittleness or dissolution occurs.
3. Maintenance Tools and Records
Essential Tools: Measuring tape, high-powered flashlight, camera, penetrant testing pen, repair adhesive/heat bonding machine.
Record Requirements: Establish maintenance files, recording inspection time, problem location, treatment measures, and follow-up results to ensure traceability.
Negotiation contact
Cathy
Yixing Shenzhou Earth Working Materials Co.,Ltd
( SHENZHOU GEOSYNTHETICS)
Add.: No.5 XinBei Road, Xinzhuang Industry Park, Yixing City, Jiangsu Province,China.
Post Code: 214221
M / WhatsApp/Wechat:+ 86 139 0153 8890
T:+ 0086-0510-8759 8866
|