Sign In | Join Free | My chinacomputerparts.com
chinacomputerparts.com
Products
Search by Category
Home > Financial Services >

High Efficiency Heat Dissipation Black PVC Cooling Tower Fill

Categories Cooling Tower Fills
Brand Name: Xcell Energy
Model Number: Black Cooling Tower Fill
Certification: SGS
Place of Origin: Jiangsu, China
MOQ: 1 Set
Price: Negotiated
Payment Terms: T/T
Supply Ability: 1000m2/per pay
Delivery Time: 7 Days
Packaging Details: Regular packaging/customizable
Name: Black Cooling Tower Fill
Condition: New
Cooling Type: BAC Cooling Tower Parts / EVAPCO Cooling Tower Parts
Usage: Cooing Tower
Material: PVC,PP,CPVC
Width: 810mm / OEM
Wave Height: 19-20mm / OEM
Thickness: 0.32-0.6mm / OEM
Length: 810*3660mm / OEM
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

High Efficiency Heat Dissipation Black PVC Cooling Tower Fill

PVC Cooling Tower Fill, High-Efficiency Heat Dissipation Black Tower Fill

Description:

Black Cooling Tower Fill PP/PVC/CPVC and other materials are resistant to high temperatures, and the surface design optimizes cross-flow aerodynamics to reduce water droplet drift losses. The lightweight structure reduces the load on the cooling tower body and has strong impact resistance. Black Cooling Tower Fill is suitable for cooling tower equipment in various industries such as textiles and sewage treatment, and can be used stably and for a long time.


Specifications:
Tech Date
Sheet Width(mm)810mm
Sheet Length810*3660mm/customized
Thickness0.32-0.6mm/customized
Sheet Spacing19-20mm
Colorgrey/white/black
MaterialPP/PVC/CPVC

Related Cooling Tower Film Fill
PP PVC International Cooling Tower Fill Replacement Cross Flow 20mm 4

PACKING AND DELIVERY

FAQ

Q: Are you trading company or manufacturer ?
A: We are manufacturer with our own factory.


Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge. And the freight cost will on the buyer's side.


Q: What is your terms of payment ?
A: Payment<=USD1000, 100% in advance. Payment>=USD1000, 30% T/T in advance ,balance before shipment.

China High Efficiency Heat Dissipation Black PVC Cooling Tower Fill factory
Send your message to this supplier
 
*From:
*To: Xcell Energy Equipment (Suzhou) Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0