| Sign In | Join Free | My chinacomputerparts.com |
|
| Categories | Cold Roll Forming Machine |
|---|---|
| Brand Name: | Saibo |
| Model Number: | Pedal plate |
| Certification: | CE/ISO |
| Place of Origin: | China |
| MOQ: | 1 set |
| Price: | negotiation |
| Supply Ability: | 300 sets per year |
| Delivery Time: | 60 working days after received deposit |
| Packaging Details: | Suitable for ocean shipment |
| Product Name: | Pedal plate roll forming machine |
| Power: | About 55kw |
| Steel thickness: | 1.0-1.5mm |
| Decoiler: | 10T Hydraulic |
| Station: | About 20 stations |
| Roller material: | Gcr15 chrome plated surface with hardness 58-62 degree |
| Drive: | Gear box |
| Material: | Cold rolled steel |
| Punching machine: | JH21-160T |
Pedal plate roll forming machine
1.Main specification
| No | Specification of the material | |
1 | Suitable Material | Cold rolled steel, Q235,Q345 |
2 | Width of the raw material | Based on the purlin sizes. |
| 3 | Thickness | 1.5mm |
2.Specification of Components
| No | Technical Specification & Remark | |
| 1 | Hydraulic Un-coiler |
|
| 2 | Leveling part |
|
| 3 | Servo feeding& punching machine |
|
| 4 | Hydraulic punching |
|
| 5 | Main Machine |
|
| 6 | Hydraulic cuttings system |
|
| 8 | Computer Control Cabinet |
|
| 9 | Out table |
|
3.Profile drawing:

4.The Chart of Process Flow
5T hydraulic de-coiler—flatten—servo feeding& punching machine—hydraulic punching—roll forming—hydraulic cutting—out table
5. Machine pictures for reference




6. Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.
|