| Sign In | Join Free | My chinacomputerparts.com |
|
| Categories | Banquet Table And Chairs |
|---|---|
| Model Number: | UK-BW044 |
| Item name: | Chiavari chair |
| Metal choice: | Iron or aluminum |
| Color: | Gold, Silver, White, Black |
| OEM & ODM: | Acceptalbe |
| Factory address: | Foshan city, China (It is near Guangzhou city) |
| Appearance: | Modern |
| Usage: | Wedding, Event, Banquet, Party |
| Design Style: | Contemporary |
| General Use: | Hotel Furniture |
| MOQ: | 50PCS each color, Accept mixed different color |
| Place of Origin: | Foshan, China |
| Brand Name: | Unik Ideas |
| MOQ: | 50 Piece |
| Price: | Factory Direct Price |
| Packaging Details: | Carton |
| Delivery Time: | 7-25 Days |
| Payment Terms: | T/T, Western Union, MoneyGram |
| Supply Ability: | 1000 Piece Per Month |
| Company Info. |
| FOSHAN UNIK IDEAS FURNITURE |
| Verified Supplier |
| View Contact Details |
| Product List |
Supplies Metal Gold White Wedding Banquet Chiavari Chair With Cushion For Event
Product Function | Wedding, event, hotel, banquet, party, outdoor and rental |
Material | Metal ( iron or aluminium is optional ) |
chiavari chair | Gold, silver, white, black or others chiavari chair |
Technics | Professional chair welding and painting |
Feature | Stackable Design, Save Storage Space, Easy To Carry |
Tupe size and thickness | 28mm diameter tupe, thickness is 1.2mm, Europe quality ( 0.8mm thick is low quality) |
Struture | 7 pipe connect legs, make chair stronger ( If use 3 pipe connect legs is not strong ) |
Complete chair size | 40*40*92cm |
Production line | 7 days after receive deposit |
Many color for options:


FAQ:
1. Q: Is it possible to know how are my products going on without
visiting your company ?
A: We will offer a detailed production schedule and send weekly
reports with digital pictures and videos which show the machining
progress.
2. Q: How can I get thesample? What's the lead time ?
A: Normally will be send in 7days. If need to open new Model, need
another 10-15days more.
3. Q: What's the lead time for mass production ?
A: 20 - 25days after down payment confirmed, can be negotiable.
4. Q: How does yourfactory control product quality ?
A: Independent quality control team with 16 inspectors in our
factory.
Third party certificated and factory audit accepted. Third party quality control accepted.
5. Q: What about the payment terms ?
A: 40% deposit by T / T, 60% before all shipment.
|