Sign In | Join Free | My chinacomputerparts.com
chinacomputerparts.com
Products
Search by Category
Home > Other Processing Services >

Small Hub 2 Ton Wheel Loader Automatic Assembly Production Line Frame And Axle Fastened

Categories 2 Ton Wheel Loader
Brand Name: MCLLROY
Model Number: MCL932 ZL932
Certification: CE,ISO9001
Place of Origin: China
MOQ: 1 Set
Price: $ 4000-6000 /Unit
Payment Terms: 30% T / T in advance and 70% balance before shipment Or 100% L/C at sight
Supply Ability: 100 sets / month
Delivery Time: 5-8 working days
Packaging Details: Nude ,3 Sets Fasten Packing in 1 40HQ
Rated power: 58kw
Max.Dump Clearance: 3200mm
Rated Load: 1800kg
Bucket Capacity: 1.0m3
Operating Weight: 3670 kg
Emissions: EU Stage II
Engine Model: Yun Nei 490 Supercharged
Max. Travel Speed: 28 km/h
Gear Box: CVT 265 torque converter
Axle: Small hub
Axle Base: 2210 mm
Brake: Disc Brake
Hydraulic Cycle time - lift: ≤ 7 s
Min. Ground Clearance: 290 mm
Wheel Base: 1490 mm
Reach at Max.Dump Height: 3200 mm
Dump Reach: ≤ 650 mm
Overall Length - With Bucket: 5300 mm
Overall Width: 1820 mm
Overall Height: 2670 mm
Tyre Size: 20.5-16
Breakout Force: 40 KN
Joystick: Machanical
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Small Hub 2 Ton Wheel Loader Automatic Assembly Production Line Frame And Axle Fastened

2 Ton Loader Wheel Loader Automatic Assembly Production Line Frame And Axle Fastened


1. Products Description

MCLLROY wheel loader is wildly used in construction, agriculture ,garden,etc. And we are experiencing in making high quality efficiency productivity.Strong power and chassis help to muddy road condition,flexible turning is suitable for small space ,excellent unloading height helpful for loading.

For the axle of this loader, we use cast steel small axle housing. There are iron axle and Isuzu axle on the market. The axles play a key role in loader working and walking. Especially under severe working conditions, the internal forces of the axles is large. A good axle allows users to drive safely and work with confidence.


2. Specification

MODELMCL 932/ZL 932Metric Units
ENGINEEngine ModelYun Nei 490 Supercharged
RPM2400
Rated Power58 kW
EmissionsEU Stage II
WEIGHTSOperating Weight3670 kg
Rated Load1800 kg
BUCKETSBucket Capacities0.6-1.0 m³
TRANSMISSIONMax. Travel Speed28 km/h
Gear BoxCVT
265 torque converter
AxleSmall hub
Axle Base2210 mm
BrakeDisc Brake
HYDRAULIC SYSTEMHydraulic Cycle time - lift≤ 7 s
DIMENSIONS(APPROXIMATE)Min. Ground Clearance290 mm
Wheel Base1490 mm
Reach at Max.Dump Height3200 mm
Dump Reach≤ 650 mm
Overall Length - With Bucket5300 mm
Overall Width1820 mm
Overall Height2670 mm
OPERATING SPECIFICATIONSTyre Size20.5-16
Breakout Force40 KN
JoystickMachanical
Min. turning radius≤ 7000 mm
STANDARD EQUIPMENTHour meterYes
Tool BoxYes
Dual Hight&Low Speed HandleYes
OPTIONAL EQUIPMENTAir Conditioning/heaterOption
Quick ChangeOption
Multifunctional AttachmentOption
Hydraulic PilotOption

3. Details and Advantages

The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.

1) Tire:A variety of patterns to adapt to different perorations ,solid tires available.

2) Frame:Strong hinge joint.

3) Cab:

I. Electronic oil level indicator.

II. Comfortable seat with safety belt.

III. Intelligent instrument.

IV. Pilot valve hydraulic operation.

4) Wide-opening hood for easier servicing & maintenance of engine.

5) MCLLROY design engine cover,automatic power-off electronic flame-out ,no knife.


4.Production lines:

A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection

Assembly:

Our factory arrange seven steps for assembly. There are over a thousand parts in a loader. I will talk about assembly of major components.

First, our workers will assemble the front frame, rear frame, swing frame, front axle, rear axle together, and then install air tank, relief valve, air booster pump on the frame.

At this step, the worker should pay attention to the tightness of the screws and adjust the gap: for example, the hinged part is not supposed to move up and down and must be tight (can be shaken left and right); there is also a gap between the swing frame and rear frame, which can be moved up and down, but not back and forth; and Gear oil should be added to the front and rear axles.




2 ton loader
front head loader
front end loaders
hydraulic front loader
front hand loader

China Small Hub 2 Ton Wheel Loader Automatic Assembly Production Line Frame And Axle Fastened factory
Send your message to this supplier
 
*From:
*To: Chanchiyo Holdings Group
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0