Sign In | Join Free | My chinacomputerparts.com |
|
Categories | CZ Purlin Roll Forming Machine |
---|---|
Brand Name: | FMS |
Certification: | ISO CE |
Place of Origin: | CHINA MAINLAND |
MOQ: | 1 Set |
Price: | Negotiable |
Payment Terms: | L/C, T/T, D/A, D/P |
Supply Ability: | 20 Sets Per Month |
Delivery Time: | 30 Working Days |
Packaging Details: | 40' FLC |
Product Name: | Tophat Roll Forming Machine Omega Profile Stud Making |
Core Components: | PLC, Engine, Motor, Gear, Pump |
Production Capacity: | 8-25m /min |
Material Thickness: | 1mm - 3 mm |
Weight: | 3 tons |
Warranty: | 1 Year |
power: | 8.5KW |
Control system: | PLC |
Company Info. |
Cangzhou Famous International Trading Co., Ltd |
Verified Supplier |
View Contact Details |
Product List |
Omega hat-shaped steel purlin forming machine is mainly composed of
passive unwinding rack, unwinding rack base, feed introduction
platform, leveling device, forming host, punching device, forming
and cutting device, hydraulic station, computer control cabinet and
other parts.
The finished product of hat-shaped purlin has good bending and
compression resistance, good flatness, automatic fixed-length
cutting, automatic punching, high degree of automation, and quick
and convenient installation.
Specification
No. | Item | Description |
1 | Material Thickness | 1 mm- 3 mm |
2 | Working Speed | 8-25m/min ( not including the cutting time) |
3 | Pump motor | 4KW; Cutting |
4 | Cutting tool material | Cr12, Heat treatment |
5 | Electrical Control System | PLC |
6 | Main Motor | 5.5KW |
7 | Liner speed of roll former | approx. 15~18m/min |
8 | Power Supply | 380V, 60HZ, 3 PHASES(can be customized) |
9 | Cutting Accuracy | ±2 mm |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects
for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period
in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.
![]() |