Sign In | Join Free | My chinacomputerparts.com
chinacomputerparts.com
Products
Search by Category
Home > Other Machinery & Industry Equipment >

500~2500mm Length Ground Mounting Screw Pile Driving Rack

Categories Solar System Components
Brand Name: TIANFON
Model Number: Ground Screw Piles
Certification: SGS,ISO 9001,ISO 14001,OHSAS 18000
Place of Origin: CHINA
MOQ: 5 set
Price: USD800-2000/set
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 30MW/month
Delivery Time: 15-25 work days
Packaging Details: standard export packing
Install site: All types of Soil
Material: Steel Q235B
Diameters: 76 mm~200 mm
Thickness: 3~3.5mm
Anticorrosive: High class hot dip galvanized
Length: 500~2500 mm
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

500~2500mm Length Ground Mounting Screw Pile Driving Rack

500~2500mm Length Customize Design Ground Mounting Screw Pile Driving Rack


Ground Screw Piles is the preferred foundation in many applications, such as Photovoltaic Solar Farm construction, Timber-frame Housing, Timber Decking, Street Light and Fence construction, Temporary Site Accommodation, Bill Board/Advertising Signs and many more applications.


Specifications:


Name

Size(mm)

Thickness(mm)

Material

Surface treatment

Photo

Piles with flange

φ 76/89,1000-2000mm(Length)

4

Q235B

Hot-Dip Galvanizing

Piles without flange

φ 76/89,1000-2000mm(Length)

4

Q235B

Hot-Dip Galvanizing

Steel pipe piles

φ 76/89,1000-2000mm(Length)

4

Q236B

Hot-Dip Galvanizing


Products can be customized according to customer requirement.


Features:


Are cost effective


Can be installed through ground water without casing


Can be removed for temporary applications


Are easily transported to remote sites


Typically required less time to install


Torque is a strong verification of capacity


Reduce the number of truck trips to a site


Eliminate concrete curing and formwork


Can be installed at a better angle for added laterial risistance


Can be installed with smaller more accessible equipment


Are installed with low noise and minimal vibrations


Can be galvanized for corrosion resistance


Minimize disturbance to environmentally sensitive sites



Packaging and delivery:


► Port: Tianjin, Shanghai, Qingdao


► Package: strong and long distance transportation package


► Payment Terms: L/C,D/A,D/P,T/T


► Delivery Detail: Delivery time:7--25 days after receiving customer’s deposits



Our Certificates:



China 500~2500mm Length Ground Mounting Screw Pile Driving Rack factory
Send your message to this supplier
 
*From:
*To: Henan Tianfon New Energy Tech. Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0