Sign In | Join Free | My chinacomputerparts.com
chinacomputerparts.com
Products
Search by Category
Home > Terminal Blocks >

Injection Molded PA66 Terminal Connector For Auto Industry

Categories Insert Injection Molding
Brand Name: Forwa
Model Number: Custom
Certification: ISO9001 / ISO14001 / IATF16949
Place of Origin: China
MOQ: 1 set
Price: Negotiation
Payment Terms: T/T
Supply Ability: About 30 Sets per month
Delivery Time: 40 days after 2D and 3D mould design confirmed
Packaging Details: Custom wooden box
Part Name: Terminal Connector
Cavity: 1*16
Material: PA66
color: Black
Runner: Hot runner
Gate: Pin gate
Cavity steel: 1.2343-HRC52~54
Core Steel: 1.2343-HRC52~54
Insert Steel: 1.2343-HRC52~54
Generial polishing: General Polishing
Tolerance: +/-0.02
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Injection Molded PA66 Terminal Connector For Auto Industry

Terminal Connector for Auto inductry , Metal Connector , Part is key to transfer electricity .


Mould information

1.Mould standardDME
2.Mould type2 Plate
3.Mould base steelChinese P20-HRC28~32
4.A/B plate steelChinese P20-HRC28~32
5.Core/Caviry steel1.2343-HRC52~54
6.Runner typeHot runner
7.Gate typePin gate
8.Project nameTerminal Connector
9.Part nameMetal Connector
10.Material availablePA66
11.Shrinkage rate1.009
12.Part colorBlack or Blue
13.Surface finishingGeneral Polishing
14.Cycle time56s
15.Injection machine200T
16.Injection machine brandArburg / Fanuc / Haitian
17.2D Mould structureCAD Software (DWG, DXF Format)
18.3D Mould structureUG, Proe Software (Prt, X-T, stp, step, Igs, Iges, Format etc.)
19.Mould folw reportCAD Mould flow (PPT format)
20.Mould processing reportUpdate each week
21.MOQ1 set
22.Payment termT/T
23.PackageCustom Wooden box
24.Deliverly date40 days
25.Mould numberAccording to customer requirement
26.Mould life1 million shots

Part Function:

The terminal connector is for Auto industry. The part is the key to transfer the electricity.

This is overmold with metal sheet. So the mold have to be processed very precision.

Any deviation will caused the metal sheet damager.


FAQ

Q: How can you get the quotation?

When we get the detailed information during working days, we will provide you the quotation within 24 hours.

Please help to provide us the following information with your inquiry.


1) 2D Part drawing. (CAD or DXF format)
2) 3D Part drawing. (Prt, X-T, stp, step, Igs, Iges, Format etc.)

3) Mould cavity. (1*1 or 1*2 or 1*4 etc.)
3) Part Material. (Material requirement or Material date sheet)

4) Mould standard. (DME or HASCO or LKM)

5) Mould standard component. (DME or HASCO or MISUMI or LKM)

6) Mould Steel. (1.2344 or 1.2738H or NAK80 or 1.2767 etc.)
7) Part surface treatment. (General polishing or mirror polishing or VID3400-Ref# or Tuxture or SPI-#)
8) Quantity of plastic part. (per order / per month / annual)

9) Mould life. (100K or 500K or 1000K)
10) Any special demands or requirements, such as packing, labels,delivery etc.




Q: What are the main oversea markets of Forwa?
1)Currently Forwa regular oversea customers are from the USA, the UK, Italy, Germany, France and India etc.


Q: How do we control the quality?

1). When getting the new order, Our team will open a meeting to analyze the part stucture and mould stucture carefully to ensure everyting is great.
2). Our team will review the mould design and improve it to ensure mould life and mould operation before start to build the mould.

3). The project team will follow each step mould processing to ensure the mould processing on time and the mould processing quality.

4). Our QC team will inspect all the mould components after each processing step finish and then go next step.

5). Our technical team will fit the mould carefully.

6). After the mould completed, our project team will check the mould operation before testing the mould.

7). Mould need to run about 3~4 hours during testing to ensure the mould operation.

8). The first sample inspected by QC and then provide the good samples to customer for testing.

9). During production, our IPQC will check the parts per 2 hours, ensure no any rejects;
10). FQC will check the products before sending to the warehouse;
11). 100% inspected by OQC before shipping out.




Q: What should we do if customer receive defective products?
1): If receive defective product, please send us the photos, we will feedback to our engineers and QC departments and solve the problems ASAP.

Q: How to pack the moulds and products?
1).For moulds, we will be coated one-layer anti-rust oil first,and then also will be covered thin films on the mould, finally pack into fumigation wooden case.
2).And as to products, we will pack into standard export cartons or as per customer’s request to pack.

China Injection Molded PA66 Terminal Connector For Auto Industry factory
Send your message to this supplier
 
*From:
*To: FORWA PRECISE PLASTIC MOULD CO.,LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0