Sign In | Join Free | My chinacomputerparts.com |
|
Categories | Paper Towel Making Machine |
---|---|
Brand Name: | Xinyun |
Model Number: | XY-BT-288V |
Certification: | CE |
Place of Origin: | Quanzhou,Fujian |
MOQ: | 1 |
Price: | 20,000-36,000USD |
Payment Terms: | T/T, Western Union |
Supply Ability: | 200sets/year |
Delivery Time: | 60-70 days |
Packaging Details: | steel to woolen |
Model: | Xy-Bt-288v |
Unfold Size of Finished Products: | 210(L)X230±2mm Other Sizes Are Available |
Folded Size of Finished Products: | 105(L)X230±2mm Other Sizes Are Available |
Raw Material Inner Core Diameter: | 76.2mm (Other Sizes Are Available) |
Production Speed: | 900 Sheets/Line/Min |
Power: | 7.5-35kw (380V 50Hz 3phases) |
Programmable Controller: | PLC Computer Controller |
Transmission Unit: | Timing Belt and Flat Belt |
Embossing Unit: | Steel to Steel |
Model | XY-BT-288V |
Unfold size of finished products | 210(L)X230±2mm Other sizes are available |
Folded size of finished products | 105(L)X230±2mm Other sizes are available |
Raw material inner core diameter | 76.2mm (Other sizes are available) |
Production speed | 900 sheets/line/min |
Power | 11-45Kw(380V 50Hz three phase) |
Programmable controller | PLC computer controller |
Folding type | Vacuum suction " V" fold |
Transmission unit | Timing belt and flat belt |
Counter | Ink marked |
Embossing unit | Steel to steel |
Slitting unit | Pneumatic dot slitting |
Pneumatic system | 3HP Air compressor, mini air pressure 5 kg/cm2 (provided by
customer) |
Overall dimension | Depends on Machine Model |
Weight | Depend on the size and configure |
Packing:
In wooden pallet
Most of the electrical and electronic components are equipped as per export standard.
Guarantee period:
One year for mechanical parts, after-sales service is lifelong , and we offer the spare parts at preferential price long.
Technical support:
We can send the technician to your factory to install the machines and
train your workers. And you shall pay salary(100USD/day) and round-trip air tickets from
China factory to your factory, the charge of visa, food ,transportations and accommodation in your city.
Payment term:
30% down payment should be paid by T/T, the 70% balance should be paid by T/T or confirmed irrevocable L/C by draft at sight.
Material:
The customer can get the material from their local market or we can recommend supplier to you.
Lead time:
Within 60-90 days inform the customer to inspect the machine at seller’s site after receiving the down payment and the confirmation of machine drawing.
![]() |