| Sign In | Join Free | My chinacomputerparts.com |
|
| Categories | Low Pressure Die Casting Machine |
|---|---|
| Brand Name: | DZ |
| Model Number: | LPDC |
| Certification: | CE |
| Place of Origin: | China |
| MOQ: | 1 set |
| Price: | Negotiable |
| Payment Terms: | L/C, T/T, Western Union |
| Supply Ability: | 10 sets/per month |
| Delivery Time: | 30 work days |
| Packaging Details: | wood |
| Dimensions: | 6000X5250X3400(H) |
| Power: | 125KW |
| Voltage: | 380V |
| Manipulator Qty: | 2 |
| Max. weight of die: | 180KG |
| Max. dimension of die: | 500X400X250mm |
| Furnace Power: | 3X35KW |
| Furnace Qty: | 1 |
| name: | copper die casting machine |
| Company Info. |
| Xiamen DingZhu Intelligent Equipment Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
| CODE | BASIC EQUIPMENT | LPDC1-Manipulator | LPDC2-Manipulator |
| 1 | Manipulator | Light weight,hight running speed | |
| 2 | Furnace | 1.The electric furnace remains stationary;Die automatic falling and
smooth running,Casting quality is guaranteed. 2.Large melt content
up to 1800kg;There's very little change in temperature after feed
the stove 3.The furnace is round and does not deform easily,It is effectual to keep warm, energy conservation.90KW was bable to satisfy 1-Manipulator | 1.The electric furnace remains stationary;Die automatic falling and
smooth running,Casting quality is guaranteed. 2.Large melt content
up to 2000kg;There's very little change in temperature after feed
the stove.No need for frequent feeding. 3. Energy conservation:Two
manipulator share an electric furnace can save the cost of electric
furnace insulation. can save about 800 yuan one day |
| 3 | operating system | One person operates a equipment | One person operates 2-manipulators like One person operates 2 equipments and Can produce two different products at the same time |
| 4 | Riser tube | 3 riser tubes,be Able to meet different product process requirements. | |
| 5 | Riser Tube heating method | 1. The riser tube on furance cover are with ceramic sealings; 2. Riser Tube heating method: Medium frequency electricity heating, power 60KW; average power consumption: 7KW; 3. Heating time till 900℃ ≈ 90 seconds 4. Contains water cooling system. | |
| 6 | hydraulic system | 1.Components supplies with internationa high quality brands: SUN,REXROTH,YUKEN etc. 2.The components are special used, with performances of high stability, strong protection from contamination, suitable for water-based hydraulic oil operation etc. 3.The hydraulic oil ( Ethylene glycol ) works at low temperature, stable quality, not get deteriorated. 4.Servo motor driving, no vibration. saves 40% of the electricity. | |
| 7 | Die Cleaning Chamber | 1.Die Cleaning Chamber: shot blasting device (copper powder blasting) for the cleaning of the dies. 2.The dies can be moved to cleaning chamber automatically for cleaning process @ heavy oxidized contaminations condition. | |
| 8 | Automatic picking | 1.Receiving car: with performances of moving up-down; forward & backward; 2.Transport the casting products to storage vehicles directly. | |
| 9 | Change the mould | Quick die change flange, 2 mins by munually ,There is a dedicated mold change station | |
| 10 | Function | It has the function of low-pressure casting of copper alloy and zinc alloy. | |



Click the link to view video:
|