| Sign In | Join Free | My chinacomputerparts.com |
|
| Categories | DOM Steel Tube |
|---|---|
| Brand Name: | TORICH |
| Model Number: | BS6323-6 |
| Certification: | ISO9001, ISO14001, TS16949 |
| Place of Origin: | ZHEJIANG, CHINA |
| MOQ: | 5Tons |
| Price: | USD600-1200Tons |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 2000Tons per Year |
| Delivery Time: | 30-45 work days |
| Packaging Details: | DOM Steel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing |
| Keyword: | DOM STEEL TUBE |
| Standard: | BS6323-6 |
| Grade: | CEW1a CEW2a CEW3a CEW4a CEW5a |
| Surface: | Oiled |
| Shape: | Round |
| Technique: | ERW |
| OD: | 6-350mm |
| WT: | 1-35mm |
| Length: | Max 12000mm |
| Application: | Auto Industry |
| Company Info. |
| TORICH INTERNATIONAL LIMITED |
| Verified Supplier |
| View Contact Details |
| Product List |
Standard: BS6323-6
Size Range: OD: 6-350mm
WT: 1-35mm
Length: max 12000mm
Steel Grade: CEW1a CEW2a CEW3a CEW4a CEW5a
Delivery Condition:
1 BK Cold finished(hard)
2 BKW Cold finished(soft)
3 GBK Annealed
4 NBK Normalized
5 GZF Annealed (including de-scaling)
6 NZF Normalized (including de-scaling)
Product Pictures:
Packing:
Characteristic:
Good concentricity
Good OD and ID tolerance
High precision
Stable quality
Smooth roughness
DOM Steel Tube Production Process:
Raw material → Incoming inspection → Cutting → Heating → Piercing → Hammering →Pickling → Cold-drawing → Heat treatment → Physical chemistry test → Straightening → Ends cutting → Final inspection → Bundling →Storage
Torich's Chemical assurance
1.Each lot of raw materials will be tested by spectrometer before
put in storage.
2.100%PMI the mother pipe to ensure we put right material.
2.100%PMI the finished pipe again to ensure we produced right grade
Heat Treatment Assurance
A full-automatic natural gas furnace with 24 meters in length.The real temperature tolerance could be within 10℃.
FAQ
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, and it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but you need to pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance , balance before shippment.
If you have another question, pls feel free to contact us
TORICH BS6323-6 Cold Finished Electric Resistance Welded DOM Steel Tube
|