Sign In | Join Free | My chinacomputerparts.com |
|
Categories | Emergency Shutdown Valve |
---|---|
Brand Name: | veson |
Model Number: | VSF |
Certification: | ISO CE |
Place of Origin: | China |
MOQ: | 1 |
Price: | EXW Fob shanghai |
Payment Terms: | L/C, T/T |
Supply Ability: | 10000 |
Delivery Time: | 6-8 WEEKS |
Packaging Details: | Plywood package |
Material: | SS CS |
Shut Down Valve: | ESDV |
Color: | Red |
operation: | Pneumatically or hydraulically |
key words: | Emergency Shutdown Valve |
Media: | Oil |
Type: | FPBV |
Company Info. |
Veson Valve Ltd. |
Verified Supplier |
View Contact Details |
Product List |
Emergency Shutdown Valve Quarter-Turn Operation Close Valve In Less Than A Second
ESDV features are designed for accuracy and dependability
Full Open Position – Normal Operation
The ESDV provides minimal pressure Differential when Differential
when the valve the valve is in full-open-open position.
The full bore ball valve virtually acts like a pipe minimizing
process fluid turbulence
Full Closed Position – Emergency Situation
Setpoint pressure has been exceeded and the ESDV the ESDV has fully closed providing fully closed providing tight shutoff with its double-seated design.
Operation Step | Emergency Shutdown Valve Quarter-Turn Operation to Close the Valve Action |
---|---|
Step 1 | Verify the availability of power supply and ensure it is turned on. |
Step 2 | Identify the emergency shutdown valve to be closed. |
Step 3 | Position yourself in a safe location away from the valve. |
Step 4 | Locate the manual or automatic control mechanism for the valve. |
Step 5 | If using a manual control mechanism, turn the handle or lever clockwise to close the valve. |
Step 6 | If using an automatic control mechanism, initiate the shutdown sequence according to the manufacturer's instructions. |
Step 7 | Monitor the valve's position indicator to ensure it is fully closed. |
Step 8 | Confirm the valve's closure by checking the pressure or flow indicators associated with the valve. |
Step 9 | Secure the valve by engaging any locking mechanisms, if applicable. |
Step 10 | Notify the appropriate personnel or control room about the closure of the emergency shutdown valve. |
![]() |