TORICH is an enterprise that has been producing precision steel pipes and steel pipe processing for over 20 years, with a factory area of approximately 20000 square meters
| Sign In | Join Free | My chinacomputerparts.com |
|
| Categories | Heat Exchanger Steel Tube |
|---|---|
| Place of Origin: | Zhejiang, China (Mainland) |
| Brand Name: | Torich |
| Model Number: | 304 304H 316 316L etc |
| Certification: | ISO |
| Price: | negotiable |
| MOQ: | negotiable |
| Standard: | ASTM |
| Type: | Seamless, Seamless |
| Steel Grade: | 300 Series |
| Application: | Boiler and Heat exchange |
| Welding Line Type: | Seamless |
| Thickness: | 0.5-12mm |
| Outer Diameter: | 6-127mm |
| Product name: | 304 316 304H Stainless steel heat exchanger and boiler tubes |
| Keyword: | heat exchanger stainless steel tubes |
| Model No: | ASTM A213 |
| End protector: | Plain |
| Length: | 3-22m |
| Company Info. |
| TORICH INTERNATIONAL LIMITED |
| Verified Supplier |
| View Contact Details |
| Product List |
![]()
Torich 304 316 304H Stainless steel heat exchanger and boiler tubes
heat exchanger stainless steel tubes
OD:6-127mm
WT:0.5-12mm
SA213 long steel tubes, make to U bend tubes for boilers and heat
exchangers.
With strong wood structure box packing by containers loading and
shipping.
Heater tubes U TUBES with Stainless, Alloy steel grade available, Carbon Steel grade is also available.
Mechanical Properties:
Material | Mechanical Properties | ||
Tensile Strength ≥ MPa | yield strength ≥ MPa | Elongation ≥ % | |
TP304 | 515 | 205 | 35 |
TP304L | 458 | 170 | 35 |
TP316 | 515 | 205 | 35 |
TP316L | 485 | 170 | 35 |
TP317 | 515 | 205 | 35 |
TP317L | 515 | 205 | 35 |
TP321 | 515 | 205 | 35 |
Acknowledge:
Gauge-Inch-mm Gauge 12 14 15 16
![]()

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring
Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield
Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.
![]()
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
|