Sign In | Join Free | My chinacomputerparts.com
chinacomputerparts.com
Products
Search by Category
Home > Boiler Parts >

High Efficiency Manifold Headers Heat Exchange Power Station Plant Boiler Parts

Categories Boiler Manifold Headers
Brand Name: HDB
Model Number: Boiler Manifold Header
Certification: ISO9001 , SGS , TUV , ASME , EN
Place of Origin: Jiangsu , China
MOQ: 1 Set
Payment Terms: L/C, T/T
Condition: New
Working Temperature: 445 Degree
Type: Ultra Super Critical
Material: 15CrMoG / 12Cr1MoVG
OEM: Yes
Color: Customized
Specification: Customized
Packing: Iron Frame Package
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

High Efficiency Manifold Headers Heat Exchange Power Station Plant Boiler Parts

High Efficient Manifold Headers Heat Exchange Power Station Plant Boiler Parts
Product Description
The headers of boilers include water-cooling hinders of boilers proper, economizer hinders, superheater hinders, etc. They function for gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.
1Headers form an important part of all types of boilers.
2Steam from the generating tubes is collected in headers which are therefore always under pressure.
3This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

The mainly function of manifold headers is to collect working material or distribute working materials to other pipes.That is collect,mix,distribute working material,ensure uniform distribution and heating.



Product Details


1.The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.


2.In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.


Product Functions


The collecting box is the pipe fitting for boiler working medium mixing and ensuring uniform heating of working medium. Industrial boiler furnace wall is usually composed of rows and rows of tubes (water wall) together, but boiler huge volume, complicated structure, cannot guarantee that all the working medium in the pipe of heat absorption capacity is the same, different parts of heat absorption differs a lot, install header can let each pipe working medium inside converge here, the redistribution to the next level in the tube, so that we can reduce the thermal deviation, make the working medium heat, cooling flow, boiler, the boiler thermal efficiency are optimized to improve; In addition, the size, quantity and arrangement of pipes in the upper, middle and lower parts of the boiler are different, and the collecting box is responsible for connecting each section to ensure the smooth flow of working quality.



Product Features


Headers form an important part of all types of boilers. Steam from the generating tubes is collected in headers which are therefore always under pressure. This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them. Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the headers


Bevelling and weld preparation of stubs duly tack-welded to the main body of the header are first shown to Chief Inspector of Boilers for his approval and once again the stubs fully welded with main body are shown to Chief Inspector of Boilers under hydraulic pressure, varying from 1000 to 3000 psi as required by the specifications.


The headers are stamped by Chief Inspector of Boilers before they leave our manufacturing plant. We also weld skubolets and weldolets in place of stubs.


Classification


MaterialCarbon steel,Alloy steel,Stainless steel.
LengthAccording to costumes requirements.
Temperature Range300℃~1500℃
Diameter(OD)76mm~914mm

Certificate


Application


CFB distributing economizer header with high welding technique have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.

China High Efficiency Manifold Headers Heat Exchange Power Station Plant Boiler Parts factory
Send your message to this supplier
 
*From:
*To: Zhangjiagang HuaDong Boiler Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0