| Sign In | Join Free | My chinacomputerparts.com |
|
| Categories | Liquid Tank Truck |
|---|---|
| Brand Name: | Dong Run Ze |
| Model Number: | DFAC |
| Certification: | C3 |
| Place of Origin: | Hubei ,China |
| MOQ: | 1 Unit Call /WhatsApp:+8615271357675 |
| Price: | Negotiated at Weichat:King253725877 |
| Payment Terms: | TT emial to <253725877@qq.com> |
| Supply Ability: | Ask us for Better Price <253725877@qq.com> |
| Delivery Time: | 25 working days |
| Packaging Details: | Some Body Part By containers , Truck by Ro-Ro or Bulk base on the ship and port in your country. If the truck on the deck, we will spray antirust paint with free. please emial to |
| HS-Code: | 8705909990 |
| Cell: | 8615271357675 |
| Tank material: | carbon steel ,stainless steel ,aluminium alloy |
| Dimension: | 7000*2290*2800 |
| Superstructure: | flow meter, rolling hose,nozzle , compartments number |
| pump: | oil pump Single Nozzle Fuel Dispenser |
7000 Liters Oil Bowser For Vehicle Refueling With PTO Fuel Pump Single Nozzle Fuel Dispenser
tem | Unit | Description | ||||||
Dimension | mm | 7000*2290*2800 | ||||||
Sample Tank Dimension | mm | 4900*2100*1400 Option: 6~11 Cubic meter to be confirmed | ||||||
m 3 | 7 cubic meter carbon steel tank | |||||||
Curb Weight | kg | 4410 | ||||||
Wheel Base | mm | 3800 | ||||||
F/R track base | mm | 1831/1640 | ||||||
F/R Axle-Load | Kg | 4000/8000 | ||||||
Approach/Departure angle | . | 19/10 | ||||||
Traction system | 4x2 | Tire Specification/Number | 8.25-16 / 7 Units | |||||
Max speed | 90 km/h | Number of axles | 2 | |||||
Cab passenger | 3 | Electric System | 24V | |||||
Driven System | Left hand | |||||||
Air Condition | Option | CD, Radio, | ||||||
Remark: | Tank is made of 5mm carboon steel . Option~340USD if installing Air Condition. Option~2000 USD if equiping with Refueling device, Refueling gun. | |||||||


FAQ
· MOQ:1 SET
· Delivery date:25 workdays after we received deposit.
· Payment term:
1. 30% contract value as the deposit by T/T,70% contract value
payoff before delivery after production finish.
2. 50% contract value as the deposit by T/T,50% contract value
payoff before delivery after production finish
|