Sign In | Join Free | My chinacomputerparts.com
chinacomputerparts.com
Products
Search by Category
Home > Scaffoldings >

High Load Capacity Scaffolding Steel Props

Categories Scaffolding Steel Prop
Brand Name: HORIZON
Model Number: Telescopic Prop
Certification: SGS
Place of Origin: CHINA
MOQ: 2000 pcs
Price: pls ask HORIZON
Payment Terms: L/C, T/T
Supply Ability: 20000 pcs per week
Delivery Time: 15-25 days
Packaging Details: pallets, bundles, bulk
Material: Q235 steel pipe
OEM: Available
finishing: zinc-plate, hdg, painting, powder coating
Standard: EN1065
Size: Prop 30-350
Application: for slab formwork errection
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

High Load Capacity Scaffolding Steel Props


High Load Capacity Scaffolding Steel Props Following EN1065 Standard


HORIZON props are used for the shoring on many building sites and our customers appreciate them for their high efficiency and ease of use.

The high load capability makes HORIZON props the top choice offering reliability and safety for any construction job.

Excellent quality is guaranteed by using high quality of raw materials, the manufacturing process and final treatment applied to the props. All these result in safe and efficient use on sites.

The manufacture of Telescopic Props is certified in accordance with standard EN 1065.

SpecificationCapacity (KN)Height (mm)Dia (mm)Weight (Kg)
HZP30-300301650-300075/6020.9
HZP30-350301970-350075/6023.0
HZP30-400302210-400075/6025.0
HZP20-300201650-300060/4815.7
HZP20-350201970-350060/4816.6
HZP20-450202460-450060/4828.2
HZP20-500202710-500060/4830.5


Advantages:
1. High quality steel tubes ensures its high loading capacity.
2. Various finishing are available, such as: hot-dipped galvanization, cold galvanization, powder coating and painting.
3. Special design prevents the operator from hurting his hands between the inner and outer tube.
4. The inner tube, pin and adjustable nut are designed protected against unintentional disengagement.
5. With the same size of the plate and base plate, the prop heads are easily to insert in the inner tube and outer tube.
6. The strong pallets ensure the transportation easily and safely.


China High Load Capacity Scaffolding Steel Props factory
Send your message to this supplier
 
*From:
*To: HORIZON FORMWORK CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0