| Sign In | Join Free | My chinacomputerparts.com |
|
| Categories | Outdoor LED Wall Lights |
|---|---|
| Brand Name: | VELLNICE |
| Model Number: | W3A0218 |
| Certification: | CE RoHs |
| Place of Origin: | Guangdong, China (Mainland) |
| MOQ: | 100pcs |
| Price: | Negotiation |
| Payment Terms: | Western Union, L/C, T/T |
| Supply Ability: | 1,00000 pcs per month |
| Delivery Time: | 25 working days after received your payment |
| Packaging Details: | 16 pcs per carton, carton size 340*340*370mm |
| Material: | Aluminum Alloy |
| Color: | White/Black/Silver |
| CCT: | 3000K |
| CRI: | 85 |
| Lifetime: | 50000h |
| IP rate: | IP65 |
| Power: | 3W/2W |
| Finish: | Powder coating |
| Application: | Exterior corridors, aisles and etc |
| Warranty: | Five years warranty |
| Company Info. |
| Vellnice Lighting Company Ltd |
| View Contact Details |
| Product List |
| Specs W3A0218: | |
| 1.Main materials: | die-cast aluminum alloy |
| 2.Power supply unit: | 2-step dimmable LED driver(included) |
| 3.Lumen: | 140lm,300mA,3W 85lm,180mA,2W |
| 4.Lamp source: | Citizen LED 3W |
| 5.Secondary optics: | opal PC |
| 6.Beam angle: | 90 |
| 7.Ingress protection: | IP65 |
| 8.Certification: | CE RoHs |
| 9.Finishing: | OW/OS/OF |
| 10.Dimensions: | 140*55*115 mm |
| 11.Cutout: | NA |
Feature
1.Excellent lighting effect
2.Easy installation
3.2-steps dimmable driver for different lumen output
4.pre-installation plate design to avoid raining flush and water flow
5.Loop in and out
Picture

Dimension


Shipment & payment
| Shipment | |||
| Model of Transport | Advantage | Disadvantage | Advices |
| Express Delivery(Door to door) | Fast(3-6days)door to door,wide area coverage | Volume&weight restricted | Good for small cargoes |
| Sea transport(port to port) | Cheapest volume Unlimited | Long sailing time(15-30days).influenced by climate and port condition | Bulk cargo Loose time |
| Air transport(air port to air port) | Fast (4-5days) Simple package | The most expensive volume restricted | For valuable cargo Urgent need |
Trade Terms:
1).Payment: T/T , 30% deposits before production, 70% balance to be
paid before delivery .
2).Production lead time for the bulk: 25days
3).Shipping freight are quoted under your requests
4).Shipping port: Shenzhen, Mainland China
Installation
Note:
1.The luminaire should be installed by a licensed electrician and in accordance with local regulations. Make sure that the power is off before installation or maintenance.
2.Two installation mode to choose(surface mounted cable and embed mounted cable)



|