| Sign In | Join Free | My chinacomputerparts.com |
|
| Categories | Wire Decoiler Equipment |
|---|---|
| Brand Name: | HYD |
| Model Number: | M7745K-9S |
| Certification: | CE / IS09001 |
| Place of Origin: | Dongguan,China |
| MOQ: | 1 Set |
| Price: | Negotiable |
| Payment Terms: | L/C, D/A, D/P, Western Union, MoneyGram |
| Supply Ability: | 10 Pcs Per Month |
| Delivery Time: | 30 Days |
| Packaging Details: | Standard Seaworthy Plywood Case |
| Wire Diameter: | 1-9mm |
| Height: | 15 to 380mm |
| Payment Term: | T/T |
| Motor power: | 22KW |
| Nearest Port: | Shenzhen,China |
| Company Info. |
| Dongguan Hua Yi Da Spring Machinery Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Wire Diameter 1 - 9mm Automatic Spring Grinding Machine of Height 15-380mm
| M7745-9S Spring Grinding Machine Technical parameters | |
| wire Diameter | 1-9mm |
| outside diameter | 100mm |
| height of spring | 15-380mm (above 100mm compensation repair at any time, under 100mm firstly reset and then trim) |
| diameter of feed plate | 580mm |
| grinding wheel diameter | 450*50*60 |
| grinding wheel turning speed | 1400r/min |
| wire Speed of grinding wheel | 35 m/s |
| speed of feed plate | 3-24 r/min |
| motor power | 22KW |
| blowing rate of cooling fan | 2500-3800 |
| Machine weight: | 4300 |
| machine size | 2235*1940*2287mm |
| dust wiper is equipped by user | |
| working temperature : | +5℃ to 40℃ |
| humidity | max 90% |
Why us
• Independent R&D ability
• 15 years experience in spring machine industry
• Quick and patient reply for Bfore&After sale service
• Tranning in factory is available,spring set-up in machine for
shipment
FAQ
1. Q: What information will be helping to get an accurate quotation from us?
A: The customer should provide the related drawings, pictures,
industrial voltage, planned output, technical requirements, etc
2. Q: What is the power supply of the machine?
A: The standard power supply in China is 380V, 3P, 50Hz. We also can customized as per requirement.
3. Q: What is the payment term
A: The payment term is 30% deposit as PO confirmation ,and 70%
should be finished before the shipment.We also accept other payment
term.
4 Q: What is the delivery time?
A: Normally the manufacturing time of the machine is 30 days after
receiving deposit.But it depends on machine model.Some machine
production can be finished within 15 days.
5. Q: What is the guarantee period of the machine?
A: The guarantee period is one year from the date of B/L.
|