Sign In | Join Free | My chinacomputerparts.com
chinacomputerparts.com
Products
Search by Category
Home > Moulds >

Malting Packing Production Line With Steeping Tank , Germinating Kilning Box

Categories Packing Production Line
Brand Name: Gongda
Model Number: GD-ZM
Certification: CE, UL,ISO
Place of Origin: China
MOQ: Negotiable
Price: Negotiable
Payment Terms: TT
Supply Ability: 20 sets per month
Delivery Time: 40-50 working days
Packaging Details: iron frame /plate
Voltage: 220V or 380V or Customized
material: SUS304
Type: Germinating And Kilning Box
Condition:: New
Application:: Beer or Beverage
Automatic Grade:: Automatic
Driven Type:: Electric 380V 50Hz 3 phase, According to Customer request
Material:: SUS304
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Malting Packing Production Line With Steeping Tank , Germinating Kilning Box

    Malting Packing Production Line With Steeping Tank , Germinating Kilning Box


    Germinating And Kilning Box is our long-term production on the basis of malting equipment. It is used of advanced technology and processes, several new products designed to improve with small area, large output, reliable performance, energy saving, durable, easy maintenance, etc. It is widely suitable for malting, beer, grain processing and other major manufacturers of equipment for use.


    Main technology specification


    1. Production capacity: 3T/Batch;


    2. Germination air consumption: 600m³/h


    3. Kilning air consumption: 4800m³/h


    4. Air cool capacity: 5334Kj/h


    5. Air heating capacity: 301450Kj/h


    6. Germination time: about 120 hours


    7. Kilning time: 26-28 hours

    Main technology parameter


    1. Overall size: 7000×2300×2600mm


    2. Weight: 980kg (excluding motor)


    3. Power:1.1kw, speed 1400 rev / min


    4. Rotary arm Power:4kw, speed 1400 rev / min


    5. screw speed: 8R/min

    Malting flow:


    1. The barley with water pumped malting machine, which will drain the water


    2. Spray, malting barley in one machine quickly germinate, germination process to keep the spray, so that the grain required to achieve the degree of steeping, germination while intermittently open air blower timely pass, while carbon dioxide emissions generated germination and germination is completed in about 5 days.


    3. Germination is complete, open the fuel hot air blower, direct drying 28-36 hours out of the box in the box.

    Machine installation

    Machine installation:


    Machine requires a solid and smooth cement placed on a flat ground.

    Machine lubrication


    Where a rotating or moving friction parts should be regularly inject a small amount of oil.

    Machine checking


    When the new machine factory, the gap has been adjusted to the correct position and size, except in special circumstances generally do not need the user to adjust, but should check for damage and missing parts, and then the following inspection and reinspection.

    1, Machine Checking before turning


    (1) Tightness and security guards before starting the check belt is reliable, various parts of the fasteners loose.


    (2) Check the oil in these parts.

    2, Dynamic load transfer checks

    (1) View cantilever starter motor rotation direction is correct, whether the required speed.


    (2) Carefully observe whether the channeling axis, percussion and other abnormal conditions.

    .

    (3) No-load operation for at least 15 minutes to check.

    (4)Machine Operation


    (1) Off gate handle, flow indicators adjusted to the appropriate location.


    (2) Starter motor.


    (3) Pump the soaked barley to the malt box .


    (4) After the end of each day, you should remove the slag machine memory, the machine body and the surrounding clean.

    (5) Precautions


    (1) Remember first boot backward feed.


    (2) Prevent nails, of metal, hard rock mixed with feed.

    China Malting Packing Production Line With Steeping Tank , Germinating Kilning Box factory
    Send your message to this supplier
     
    *From:
    *To: Shandong Dehui Fermentation Intelligent Equipment Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0